tim: Blogging a Timber Frame House > Home > tim's Home page > Building a Timber Frame Home > Build Blog > 

Diggers in action again

A visit from our friendly excavator guy has tidied up the grading a lot and removed huge piles of accumulated junk, waste and recyclable left-overs. We now have a sensible vehicle parking and turning space in front of the garage along with ground levels at the various doors that are pretty much final.

IMG_0583
IMG_0584
Grading and tidying makes neat.

But we still don’t have the lower living room floor complete. Just this tiny amount needed to finish the job.

IMG_0586
Incomplete floor makes annoying