tim: Blogging a Timber Frame House > Home > tim's Home page > Building a Timber Frame Home > Build Blog > 

Up the pipe

Before the chimney for the propane fireplace can be installed we need a hole in the roof for it to pass through. I spent today cutting a modest sized chunk out of the ceiling, carving the foam out, making a frame for the inside of the hole and then getting it all tidy. An entire day with your arms above your head hurts.
Hopefully, tomorrow will bring the front door.