Plumbing in the pot
21/Feb/11 19:31
A couple of plumbers spent the day fitting about half the finish plumbing; one toilet, several sinks, the hot water tank, the guest bath fittings etc. As a result we now have a pot to piss in!

Mudroom loo and sink now fully functional.
The master bathroom tub didn’t get installed because of a misunderstanding about how to install the taps - after originally discussing the matter with one of the plumbing staff I had set things up as agreed but that didn’t please the guy on site today. So I have a bit of fiddling to do to make it work to his satisfaction. Since the bath is large and cumbersome we couldn’t install the sinks and loo either since they would be in the way for moving the tub around.
A bunch of flooring got laid in the guest bedroom - a good place to practise - and looks pretty good.

First strips of flooring going down